HOME       CAREER       FEEDBACK       CONTACT 
SAMSARA SHIPPING PVT LTD

HALDIA TANKER

OUR CONTACT AT HALDIA TANKER

Samsara Shipping Pvt. Ltd.
Akash Ganga Commercial Complex
3rd Floor, Room No- 3/3, Village-Basudevpur
P.O -Khanjanchak, P.S - Durgachak, Haldia
District-Purba Medinipur, W.B.,Pincode-721602

CONTACT
Tel : +91 - 3224 - 275212
Fax : +91 - 3224 - 275256
Email : bulkopsindia@samsarashipping.com

HALDIA TANKER PORT

BA CHARTS
• BA123, BA135, BA136 (Starting FM Sandheads), Local chart 265 N Hooghli river chart
ANCHORAGE
• Vessels to contact Sagar VTS/ pilot station on arrival on VHF CH 16 OR 68 OR SSB 4147.4 KHZ.
Vessels awaiting pilot boarding instructions to anchor about 5 to 8 miles south-east of way point 1 of western channel.
PILOTAGE
Kindly note the vessels are bring by Port Authority through Western Channel only . While vessel will bring through Western Channel then the following Waypoints to be crossed while proceed to Haldia :-

Western Channel:
Pilot boarding ground in vicinity of
WP 6 : LAT 21°35.30 N LONG 087°52.35 E

Western/Eden channel pilot boarding approach waypoints in WGS84
SL NAME CO-ORDINATES
1 WP 1 21 °05.00 N 087 ° 51.30E
2 WP 2 21 °12.30 N 087 ° 51.30E
3 WP 3 21 °21.70 N 087 ° 48.60E
4 WP 4 21 °26.80 N 087 ° 48.60E
5 WP 5 21 °32.00 N 087 ° 50.70E
6 WP 6 21 °35.30 N 087 ° 52.35E
7 WP 7 21 °38.60 N 087 ° 54.00E

•Vessels to approach pilot boarding ground in a convoy
• Both anchors to be standby for emergency from WP1 onwards
• Vessels to get underway in good time and take up their respective positions in the convoy before passing the WP NO.3
• Distance of about 2.0 nautical miles to be maintained from the ship ahead in the convoy
• All vessels to confirm pilot boarding instructions with SAGAR VTS over VHF on CH 68 or SSB before heaving up anchor and inform sagar VTS on VHF CH.68 or SSB 4147.4khz while passing the waypoints
• All waypoints are available on the ais as virtual targets
• VTMS assitance available from 3.0 miles south of WP 4 to pilot boarding ground at WP 6
• Pilot boarding speed about 6 to 8 knots
• Lee for the pilot launch may be provided at pilot boarding ground as advised by the VTMS pilot
• Regulation pilot ladder to be rigged on both port and starboard sides with two man ropes and a heaving line as advised by sagar VTS/pilot staion. vessels with freeboard more than 09 mtrs must rig up combination ladder
• All ships to confirm safe pilot boarding arrangements before passing WP3 to avoid delays and close quarter situation in the convoy due to faulty pilot ladder arrangements
• Vessels to have operational ais pilot plug and a 3 pin power output for the pilot's laptop
• Pilot launches "RUPSA" & "HUGLI" are fitted with AIS transponders Kindly keep the pilot cabin neat & clean and provide good hospitality for port pilots
During the maneuvouring time for SLG FM HALDIA Lock gate to approach jetty abt 300mtr distanse straight , the dock master will guide FM shore through VHF to master and river pilot will board only at approach jetty.However,dock pilot will bring the vessel FM berth or double bank position to Haldia lock gate. Since there is no priority for sailing of a ballast vessel FM HALDIA , all vessels are requested to keep min draft to sail the vessel FM HALDIA
COMMUNICATION
VHF CH. 16/68 OR SSB 4147.4 / 8295.4 E-MAIL: sagarvts@kolkataporttrust.gov.in / sagarvts2017@gmail.com
RESTRICTION
LOA/230 M, Beam/32.26 M & Draft as per day/night's permissible river draft
TIDE
All arrival and sailing is governed by tide only
WEATHER
All weather working Port .
• Rainy Season: Mid June to October 1st week.
• Dry Season : March to May
• Winter Season : December to February end/1st week of March
STEVEDORES WORKING HOURS
• Morning shift: 0600hrs to 1400hrs - Recess/1000hrs to 1030hrs;
• Afternoon shift: 1400hrs to 2200hrs - Recess/1800hrs to 1830hrs;
• Night shift: 2200hrs to 0600hrs - Recess/0200hrs to 0230hrs
FRESH WATER AVAILABLE
Suppliers are only Haldia Port Authority and the availability of water from Monday to Saturday working day only from 10.00hrs to 17.00hrs (saturday 10.00hrs to 13.00hrs) for which requisition has to be submitted well in advance. Holiday, Sunday also can be arranged with special permission for which it will be needed to pay overtime charge to port as well as fresh water charge.
FUEL / PROVISION
Bunkering can be arranged through IOCL (Indian Oil Corporation Limited) by Barge on advance 100% payment, min 4-5 working days prior notice is required for necessary arrangement. Facility of provision supply is available.
GANGWAY
Gangway can be placed at working berth at inside dock.
FLOATING CRANE / MOBILE CRANE
Mobile crane available at Berth No. 2, 4b, 8 , 12 ( private berth ) & 13
REPATRIATION
/NEAREST AIRPORT
Yes / Kolkata
HOLIDAYS
Normally cargo operation is done all round the year.
AUTHORITIES
AUTHORITIES NAME DESIGNATION CONTACT
Port Authority Mr. G Senthilvel Dy Chairman, HDC, KoPT +91-3224-263114/263209 Email: dc.hdc@nic.in
Capt. S. N. Chaubey General Manager Marine +91-3224-263303/264818 Email: snchaubey.hdc@nic.in
Capt. S. K. Gupta Manager I/C Marine +91-3224-252340 Email: skgupta.hdc@nic.in
Mr. S. K. Saha Roy General Manager Traffic I/C +91-3224-263229/264433 Email: sksaharoy.hdc@nic.in
BERTH
BERTH DRAFT(M) LOA(M) BEAM(M) DISPLACEMENT CARGO MANIFOLD CARGO RATE PER DAY (MT)
HOJ-1 Permissible day's river draft. 236M officially but185M now working 33.0M 46500T POL 2x8" 250T - 350T
HOJ-1 Permissible day's river draft. 236M officially but185M now working 33.0M 46500T LPG & Ammonia 1x6" & 2x10" LPG 650-750T
HOJ-2 Permissible day's river draft. 277M 36.0M 97500T LPG 1x12" LPG 650-900T
HOJ-1 Permissible day's river draft. 236M officially but185M now working 33.0M 46500T POL 2x8" 250T - 350T
HOJ-2 Permissible day's river draft. 277M 36.0M 97500T POL 2x12" HSD dis 700T /hr. & ldng 360 -400T Naptha : 1400mt/hr
HOJ-3 Permissible day's river draft. 275M 36.0M 98000T POL(Crude, Naptha) Crude/2 x 16" Chickson, Naptha/2 x 12" Chickson Crude: 3000-3500mt/hr, Naptha - 1400-1500mt/hr
B-2 Permissible day's river draft. 195M 32.26M 74500T PX 2x6" 650T/HR
B-3 Permissible day's river draft. 230M 32.26M 74500T PX/HSD PX 2X6" & HSD 2X8"" PX 480T & HSD 720T/HR
B-3 Permissible day's river draft. 230M 32.26M 74500T Veg oil 2x8" 210 - 350T
B-4 Permissible day's river draft. 195M 32.26M 74500T Veg oil 2x8" 211 - 350T/CONCN.
B-5 Permissible day's river draft. 170M 32.26M 71500T Veg oil 2x6" 150 -200T/CONCN.
B-6 Permissible day's river draft. 212M 32.26M 71500T Veg oil / chemical/POL 2x8" 213 - 350T/CONCN.
B-7 Permissible day's river draft. 212M 32.26M 71500T Veg oil / chemical/POL 2x8" 214 - 350T/CONCN.
PORT LAYOUT


CONTACT INFORMATION :
Haldia Port Trust Security Officer ( PFSO )
Deputy: Capt S.N.Chaubey
Phone: + 91 3224 252104//252449
Fax : + 91 3224 252251
Email : snchaubey@kopt.in; snchaubey@gmail.com
Mobile: +91 9434052449

Emergency contact for Haldia at Sandheads
Commander Sagar VTS
Mob - 9674155637
Off - 3210213463 / 3210240348
e-mail – sagarvts@kolkataporttrust.gov.in
ramnagar@kolkataporttrust.gov.in
haldiaportwireless@gmail.com - VHF - R/T: GH 16 & 68
Coast Guard Haldia
e-mail - opscentrehdq@gmail.com
Coast Guard Chennai
e-mail - isareast@dataone.in
Phone - +91 3224 263407 Fax - +91 3224 264541
PORT TARIFF BASIC
ACTIVITY UNIT TARIFF REMARKS
PORT DUES PER GRT USD 0.47817
PILOTAGE UPTO 30000 USD 0.85473
30001-60000 USD 0.68378 25641.90 US $ +68.378 cents per GRT on 30001 to 60000 GRT
ABOVE 60001 USD 0.51801 46155.30 US $ + 59.830 cents per GRT on GRT above 60000
SHIFTING CHARGE PER GRT 1) 15.94 cents subject to a minimum of 159.39 2) 19.13 cents subject to a minimum of 191.27 1) Within KDS or within HDC only 2) Between KDS and HDC
BERTH HIRE PER GRT USD 0.00398 / PER HOUR
PRIORITY equivalent to 75% of berth hire charges calculated for the total period of actual stayal at the berth subject to a minimum of one day’s berth hire charge
ANCHORAGE PER GRT 0.056 cents 1) Vessel anchored at any river anchorage or any other anchorage
TUG CHARGE 1) Vessel not exceeding 1,000 IHP.
2) Vessel exceeding 1,000 IHP.
1) 318.78 dollars per hour subject to a minimum of 956.34 dollars per operation
2) 398.48 dollars per hour subject to a minimum of 1195.43 dollars per operation.
An additional charge of 25% shall be levied when Kolkata Port Trust tug/vessel is deployed for salvage operation subject to availability of Tug.

Ship owners/Agent of vessels shall be required to pay the actual Insurance premium plus 20% whenever Kolkata Port Trust tug/vessel is deployed on requisition for towage assistance/salvage operation. In such cases claims for damages shall not be made against the hirer in case of accident.
GANGWAY N/A N/A
FENDER PER FENDER USD 115.5 PER DAY Pneumatic rubber fender
Goods and Service Tax also applicable @18% on all Port charge.
DISCLAIMER
• Informatively, there are no mooring buoys at inside Haldia Dock. Therefore, whenever a vessel has to wait for whatever reasons, Port Authority requires the vessel to be double banked. Since the vessel has to be double banked against another vessel at berth, it is quite impossible to ascertain in advance whether double banking will be ordered in case of a particular vessel since the vessel working at berth may at any time be required to accept another vessel to double bank against her. A vessel berthing inside Haldia Dock is required to have 7-8 pcs old truck tyres with PP rope on board as fenders to be used during double banking. Between the 2 vessels, 14-16 truck tyres provide adequate protection during double banking. This is a normal and everyday operation at Haldia Port and is well known to most of National/International vessel Owners/Operators.

• Hence all vessels inside the dock are requested to have sufficient fenders to protect the shipside from chaffing of paints.

• Further Port authority also provides the Pneumatic rubber fender during waiting time at inside port against the charge as per tariff.

• The requirement of B/L , PNI Entry Certificate with Wreck removal n oil pollution clause, ISM Code, ISS cert & Crew List, Ships Registry, cert of Class, PAN in standard 5 pages format , Intl Tonnage cert is required in advance.