AUTHORITIES | NAME | DESIGNATION | CONTACT |
---|---|---|---|
Port Operation Centre | M.K. Singh | Terminal Head | 9998214533 |
Port Operation Centre | Umesh Kumar | Terminal Head | 9998214577 |
BERTH | DRAFT(M) | LOA(M) | BEAM(M) | DISPLACEMENT | CARGO | MANIFOLD | CARGO RATE PER SHIFT PER HOOK IN MTS |
---|---|---|---|---|---|---|---|
A-1 | 11.5 Mtrs | 195 Mtrs | 45 Mtrs | 59850 Mt | Paraxylene, Orthoxylene, Diesel, Motor Spirit, Naphtha, Methanol | 12"150ASA | 350m3/hr, 150m3/hr, 800m3/hr. |
A | 12.5 Mtrs | 195 Mtrs | 45 Mtrs | 59850 Mt | Paraxylene, Benzene, Diesel, Motor Spirit, Naphtha, LPG, Butane, Propane, Alkylate | 12"150ASA, For LPG 8/10"300ASA | 350m3/hr, 280m3/hr, 800m3/hr, |
B | 13.5 Mtrs | 230 Mtrs | 45 Mtrs | 86450 Mt | Paraxylene, Benzene, Tame / Reformate (AFS), Diesel, Motor Spirit, ATF, Naphtha, Alkylate. | 12"150ASA, | 350m3/hr, 280m3/hr, 800m3/hr, |
C | 13.5 Mtrs | 246 Mtrs | 45 Mtrs | 112500 Mt | Tame / Reformate (AFS), Diesel, Motor Spirit, ATF, Naphtha, LPG, Butane, Propane, Alkylate. | 12"150ASA, 8/10"300ASA, | 800m3/hr, |
D | 14.5 Mtrs | 252 Mtrs | 45 Mtrs | 120000 Mt | Diesel, Motor Spirit, ATF, Naphtha, HPP crude / VGO/ F.O., | 12"150ASA, | 800m3/hr, 200m3/hr |
BERTH | DRAFT(M) | LOA(M) | BEAM(M) | DISPLACEMENT | CARGO | MANIFOLD | CARGO RATE PER SHIFT PER HOOK IN MTS |
---|---|---|---|---|---|---|---|
SPM - 1 | 22.5 Mtrs | 228 - 345 Mtrs | No Restrictions | 400000 Mt | Crude | 2x20 Inches 150ASA | 8000m3/hr with single line & 14500m3/hr with double line |
SPM - 2 | 22.5 Mtrs | 228 - 345 Mtrs | No Restrictions | 400000 Mt | Crude | 2x20 Inches 150ASA | 8000m3/hr with single line & 14500m3/hr with double line |
SPM - 3 | 22.5 Mtrs | 228 - 345 Mtrs | No Restrictions | 400000 Mt | Crude | 2x20 Inches 150ASA | 8000m3/hr with single line & 14500m3/hr with double line |
SPM - 4 | 18.5 Mtrs | 180 - 300 Mtrs | No Restrictions | 170000 Mt | Motor Spirit | 2x16 Inches 150ASA | 4500 cum/hr Maximum with one hose, if both hoses are used loading rate will be 9000 cum/hr. and Minimum loading rate for start up & topping up is 1000m3/hr. |
SPM - 5 | 18.5 Mtrs | 180 - 300 Mtrs | No Restrictions | 170000 Mt | High Speed Diesel | 2x16 Inches 150ASA | 4500 cum/hr Maximum with one hose, if both hoses are used loading rate will be 9000 cum/hr. and Minimum loading rate for start up & topping up is 1000m3/hr. |
ACTIVITY | UNIT | TARIFF | REMARKS |
---|---|---|---|
PORT DUES | RATE PER GRT | Exp 0.15 - Imp 0.20 | |
PILOTAGE | Per GRT | 0.30 | |
Mooring & Unmooring | Per GRT (3 Cent) | 0.03 | |
Miscellaneous (Garbage Misc) | Per Vessel | 50 | |
VTS | Per GRT | 4.40 | 6.60 | |
BERTH HIRE | Per GRT / Per day | 0.18 Cents | |
PRIORITY | NA | ||
ANCHORAGE | - | ||
TUG CHARGE | Per Hours | Rs.30000 Per Trip (Min 30000 FOR 10 HRS ) +18% GST | |
Pull back tug | 8 Hours | USD 6170 per Shift | |
Port Tonnage | 0.09 for Import / 0.20 for Export | ||
GANGWAY | NA | ||
FENDER | NA |